When an ATS engineer discovered that a transformer responsible for an entire production line was overheating, he was able to resolve the issue before a failure occurred. See what predictive maintenance methods ATS used to help save this leading building products manufacturer $43,000 in equipment cost avoided.
Customer Success, Process & Discrete
ATS PdM Reveals Imminent Transformer Failure Saving Manufacturer $43K
